Attendance
Mike Jones (Microsoft), Conor Cahill (Intel), Ari Kermaier and Damien Carru (Oracle), Scott Cantor (Internet2), Eric Tiffany and Dervla O'Reilly (Liberty Alliance), Paul Madsen (NTT), Sampo Kellomaki (Symlabs)
Next meeting
We will begin to meet weekly starting on 11 Mar 2008, until the 7 Apr 2008 event. (Now noted on the home page.) Note that the Liberty Alliance plenary begins on 11 Mar; some folks may be able to pop out for the call.
RSA workshop and Santa Clara dry-run logistics
As of 3 Mar 2008, 349 people have registered for the workshop, and 169 have opted in to sharing contact information with us.
Last-minute A/V requirements and issues are due no later than COB on 4 Mar 2008 (deadline has passed!).
For each of the seven confirmed scenario participants, the following "standard equipment" will be provided:
- 1 x 2 x 8 ft. table
- 21 in. monitor
- Power
- Wired Internet (note: no wifi access in this room)
- Network cables
- 1 x 1 power strip (6 outlets)
- USB keyboard and mouse (Britta has these)
We are in room 302 (+ 304) on the Esplanade level. A draft floor plan will be sent out.
Earliest access at Moscone is Sunday, 7 Apr 2008, at 1pm PST. We can stay late if we like. ;) Then again on Monday, April 7, 7am PST.
For the dry-run in Santa Clara on 11-14 Mar 2008, FuGen Solutions, Symlabs (at least the last two days), and likely Sun (can Pat confirm?) will be present. Internet2 will be prepared to do online testing during that time.
Scenario writeups
See RSA IOP Scenarios. Oracle could possibly take part in scenario 2 if more detail were provided.
AIs
New:
- Pat to review and edit the wiki.
- All to complete the new "technical contacts" column in the scenario matrices.
Pending:
- Eve to work up a draft of RSA workshop preso material - ongoing.
- Low-prio: Scott to flesh out the IdP discovery problem wiki page - table that to sometime in May.
- Mike J. to update the wiki to reflect "Chained SAML/WS-Federation SSO" discussion on new page - complete.
- Mike J. to check on the applicable version of WS-Fed that he suggests to target.